We have experience to make your project a success. After 20 years, our project list is extensive. Please select an area of interest.
![page-angle](http://mail.eri.consulting/wp-content/themes/eresources/img/page-angle.png)
Projects
FlexJet Operations Center
Cleveland, OH
- Sloping columns throughout the perimeter of the building to create dramatic sloped architectural facades
- Cantilevered steel roof members to support extended rooftop elements pointing outward in multiple directions
- Laterally supported by steel braced frames
- Two story steel framed building with a partial basement
- $20 million construction cost
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/07-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/08-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/05-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/07-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/08-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/05-EDITED-scaled.jpg?resize=810%2C487)
The Pearl
Fort Wayne, IN
- 2 levels of post-tensioned concrete for the podium structure with staged stressing of tendons
- 5 levels of load bearing cold formed steel walls above the podium with composite open web steel joists
- Elevated parking deck on the first level of post-tensioned concrete (flat slab construction)
- Post-tensioned transfer beams above the first level event space and commercial spaces
- Laterally supported by concrete shear walls
- $65 million construction cost - mixed use development
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/2-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/5-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/4-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/3-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/1-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/2-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/5-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/4-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/3-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/1-scaled-1-scaled.jpg?resize=810%2C487)
SIMCOM Aviation Training Facility
Lake Nona, FL
- Multiple second level elevations providing access to the full motion flight simulators
- Laterally supported by steel braced frames in various structural configurations to accommodate architectural and mechanical openings throughout the facility
- Two story steel framed building
- $40 million construction cost
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-2.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/05-EDITED-1-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-2.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/05-EDITED-1-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
Promenade Park
Riverfront - Fort Wayne, IN
Structural Design
- Design of Tree Canopy Trail with H-pile deep foundation system
- Design of Compass Pavilion and double-sided band shell
- Retaining wall design throughout park and seawalls on north and south side of river utilizing H-pile deep foundation system
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/First-RF-Photo-11-PNG.png?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184838470_HDR.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Third-RF-Photo-15-PNG.png?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184854598_HDR-2.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Fifth-RF-Photo-06-PNG.png?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185900030_HDR.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Seventh-RF-Photo-08-PNG.png?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185056560-horiz.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Ninth-RF-Photo-01-PNG.png?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/First-RF-Photo-11-PNG.png?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184838470_HDR.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Third-RF-Photo-15-PNG.png?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184854598_HDR-2.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Fifth-RF-Photo-06-PNG.png?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185900030_HDR.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Seventh-RF-Photo-08-PNG.png?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185056560-horiz.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2023/06/Ninth-RF-Photo-01-PNG.png?resize=810%2C487)
Skyline Tower
Fort Wayne, IN
- Twelve story + penthouse building (5 structural steel, 8 load bearing cold formed steel wall panels).
- Concentric steel braced frames extend full height for lateral support.
- Rammed aggregate piers with uplift capacity at braced frames.
- Composite steel bar joists used for Levels 6-12.
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_4946.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/DJI_0952-copy.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Skyline-10-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Composite-TEST-PORPORTIONAL-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_5862.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_5866.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_5552.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_4946.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/DJI_0952-copy.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Skyline-10-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Composite-TEST-PORPORTIONAL-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_5862.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_5866.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_5552.jpg?resize=810%2C487)
Parkview Field
Fort Wayne, IN
- New facility over $30 million
- Unique designs for netting, light poles, etc.
- Balcony overhang seating
- Structural steel framing with braced bays
- Numerous concrete retaining walls for tiered seating
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_3804-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/IMG_0439-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/webcam-image-first-night-4-16-09-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/IMG_1953-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_3804-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/IMG_0439-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/webcam-image-first-night-4-16-09-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/IMG_1953-EDIT.jpg?resize=810%2C487)
The Bradley
Fort Wayne, IN
- Floor utilizes girder slab system with hollow core planks and special steel beams
- Rooftop patio and pergola
- Laterally supported by precast shear walls
- Five story steel framed building
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0011-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0013-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0020-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_6224-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_6219-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0025-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0011-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0013-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0020-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_6224-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_6219-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0025-EDITED-scaled.jpg?resize=810%2C487)
Fort Financial Headquarters
Fort Wayne, IN
- Two story clear atrium in the main lobby
- Designed for rooftop mechanical screenwalls and solar panels
- Laterally supported by steel braced frames
- Two story steel framed building
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0428-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0418-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8814-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8806-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8808-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0428-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/DJI_0418-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8814-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8806-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8808-EDITED.jpg?resize=810%2C487)
Trine University Engineering Building
Angola, IN
- Three story clear atrium along north side of building
- Multiple floor heights and entrances to accommodate due to sloping grade
- Laterally supported by steel braced frames
- Three story steel framed building
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8786-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8787-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8790-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8784-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8788-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8786-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8787-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8790-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8784-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2024/01/IMG_8788-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
Indiana Tech University
Snyder Academic Center
Fort Wayne, IN
- Features a central radiused stair with views outside and the 3 story rotunda inside
- Central domed roof structure
- Fast-tracked design/build schedule completed in 15 months
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DSC_0497-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DSC_0453-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DJI_0046-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_7997-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_5576-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_7962-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DSC_0497-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DSC_0453-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DJI_0046-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_7997-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_5576-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_7962-EDIT.jpg?resize=810%2C487)
Taylor University
Boren Campus Center
Upland, IN
- Two story steel framed, laterally supported with ordinary steel moment frames.
- Wrapped all 4 sides of existing Rediger Chapel and separated with expansion joints.
- Tiered auditorium utilizing steel raker beams and precast concrete risers.
- Existing foundations required cantilevered roof and floor structure.
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/001_100_9084-No-Shadow-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/002_100_9079-No-WT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/003_100_9087-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_9092-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/005_001.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/004_054.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/001_100_9084-No-Shadow-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/002_100_9079-No-WT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/003_100_9087-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_9092-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/005_001.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/004_054.jpg?resize=810%2C487)
Indiana Tech University
Law School
Fort Wayne, IN
- 3 story building with exposed radiused roof decking at 3rd floor
- Features courtroom with tiered seated and domed roof
- Fast-tracked design/build schedule
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/IT-Law-School.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DJI_0024-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DJI_0006-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_0043-EDIT-w-crop.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/website3-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/website1a-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/website1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/IT-Law-School.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DJI_0024-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/DJI_0006-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/100_0043-EDIT-w-crop.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/website3-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/website1a-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/11/website1-EDIT.jpg?resize=810%2C487)
The Harrison
Fort Wayne, IN
- Four story mixed use building with below grade parking.
- Two levels of steel construction over cast-in-place concrete pan joist floor system.
- Laterally supported by a combination of concrete, CMU, and wood shear walls.
- Inset steel framed balconies on 3rd and 4th floors overlooking the ballpark.
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Harrison-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Harrison-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Harrison-7-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_1296-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_1114-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_7828-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Harrison-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Harrison-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Harrison-7-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_1296-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_1114-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_7828-EDIT.jpg?resize=810%2C487)
Turnstone Plassman Athletic Center
Fort Wayne, IN
- PEMB fieldhouse with conventional steel mezzanine.
- Natatorium framed with precast double tees bearing on CMU walls.
- Unique entry canopy which includes multi-rolled column feature to incorporate part of client's logo.
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-2-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_1179-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-006-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-003-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-2-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_1179-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-006-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-003-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/Turnstone-5-EDIT-RESIZE.jpg?resize=810%2C487)
Jackson R. Lehman YMCA
Fort Wayne, IN
- 70,000 sq. ft. YMCA facility
- PEMB gym/fieldhouse with castellated beams, conventional steel, and CMU for remainder of the building
- Accommodated large openings in pool area and added volume in the lobby space
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/DJI_0002-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/DJI_0015.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/Lehman-Pool-Complete.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/100_7888.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/IMG_1402.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/IMG_1399.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/DJI_0002-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/DJI_0015.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/Lehman-Pool-Complete.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/100_7888.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/IMG_1402.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/04/IMG_1399.jpg?resize=810%2C487)
LDM Foods
Yorkton, Saskatchewan, Canada
- Numerous building design for the $80 million facility
- 6 story structural steel building with braced bays
- Project utilized Canadian Codes
- Special foundation systems
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/LDM-1-EDIT-1024x683-NO-TS.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/Ariel-EDIT.jpg?resize=693%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/Refinary1-EDIT2.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/LDM-Jan-16-09-022-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/LDM-1-EDIT-1024x683-NO-TS.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/Ariel-EDIT.jpg?resize=693%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/Refinary1-EDIT2.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/LDM-Jan-16-09-022-EDIT.jpg?resize=810%2C487)
DeKalb Memorial Hospital
Auburn, IN
- Approximately $10+ million project
- 60,000 total square feet
- Reinforced concrete slabs, joist, and columns
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_1786-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_2806-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_2789-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/6-26-07-009-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/6-26-07-007-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/dekalb-hospital-010-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_1786-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_2806-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_2789-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/6-26-07-009-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/6-26-07-007-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/dekalb-hospital-010-EDIT.jpg?resize=810%2C487)
Indiana Wesleyan University Chapel
Marion, IN
- $15 million project with 75,000 total square feet
- 3200 seat Auditorium on tiered seating
- Long span structural steel
- Steel braced frames for lateral design
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/Chapel1-EDIT-e1509043889871.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/interior-str-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_2626-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/2010-05-28-011-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/2010-05-28-014-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/Chapel1-EDIT-e1509043889871.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/interior-str-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/100_2626-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/2010-05-28-011-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/02/2010-05-28-014-EDIT.jpg?resize=810%2C487)
IU Health Goshen Hospital -
Family Medicine and Urgent Care
Goshen, IN
- Single story 15,000 square feet steel framed medical facility.
- Incorporated hidden supplemental steel framing in stud walls to support large window openings.
- Large drive-through canopy spanning over 32 feet.
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_6705-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_6702-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_0694-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_0717-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_6705-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/100_6702-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_0694-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/10/IMG_0717-EDIT.jpg?resize=810%2C487)
Brotherhood Mutual
Fort Wayne, IN
- $3.7 million project with 56,000 square feet
- 3 Story steel structure
- Moment frames for lateral design
- Bridge design over detention basin
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/DSC_0331-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/DSC_0357-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/100_0033-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/3-18-10-006-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/Picture-3-4-10-7-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/2-18-10-045-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/2-18-10-004-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/DSC_0331-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/DSC_0357-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/100_0033-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/3-18-10-006-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/Picture-3-4-10-7-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/2-18-10-045-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/mail.eri.consulting/wp-content/uploads/2017/01/2-18-10-004-EDIT-RESIZE-1.jpg?resize=810%2C487)
View More